Steel Fabrication Work, Nagarnar
Project Specification
Client

Southern Engineering Works (SEW Infrastructure Ltd – Hyderabad)

Executed By Arun Fabricators
Steel fabricated in MT 4000 (300 MT/month)
Concrete poured in CUM

Nil

Length of pipeline in Mts

Nil

Area in SQM

25000

Time Frame

14 Months (till Now)

Project Cost INR 12 Crores (till Now)
Scope of Work:
Fabrication and Supply of Building Steel Structures For “Steel Melting Shop” For 3.0 MTPA NMDC Integrated Steel Plant At Nagarnar.